RELEASE NOTES FOR September 2025

September 30, 20252 min read

FIXED

Project Management

  • All Projects – Fixed issue where OT Hour labor cost may not calculate if OT Rate was omitted. Now defaults to a factor 1x the regular Wage Rate if not otherwise provided (9/5)

  • HR Project Request – Corrected the position of the Save button (9/26)

  • Follow-Up Projects – Fix where error may be thrown if your Thrive instance has an extra folder in the url path. (9/26)

  • Fixed adding project labor issue when using Save and New (9/26)

Training

  • Curriculum Status Matrix – Fixed legend so that Training Required / Training Out of Date had the correct definitions in the legend (9/26)

Reporting

  • Fixed reporting issue when using chart grouping by a date field and trying to sync the top chart to the table (9/26)

General

  • Task/Audit/PM – Changed the date calculation on recurring task so that Finish Date and Due Date will slide to the next valid working date when landing on a non-working or holiday date (9/5)

  • Discussions – Fixed error when searching/typing names. (9/5)

  • For Fleet and Tooling – Added grid redirects for Vendor, Customer, and Manufacturer fields on equipment pages. (9/5)

  • Tooling / Fleet Equipment Lookup Add New Link – When creating a new equipment number from the equipment dropdown, link now redirects to the correct module. (9/5)

  • Task/Audits – Fixed issue where inventory locator did not appear in location lookup when starting an audit manually (9/12)

  • Tooling / Fleet Discussions – Fixed button security settings (9/12)

  • Overall security improvements (9/12)

  • Fixed issue where user log entry was omitted when the URL parameter was NULL (9/26)

NEW

Change Management

  • Notifications – Added Sample/Template Notifications for Change Management (9/5)

  • Launch Pad Apps – Added Change Management Launch Pad App shortcuts to App Store (9/5)

Customers

  • Estimates list – Added column totals for Financial Cost and Total fields (9/12)

Inventory

  • On the Inventory Issue Form, when picking from the available locations the list now shows the Quantity On Hand next to the location (9/5)

Project Management

  • Task/Audit/PM – Changed the date calculation on recurring task so that Finish Date and Due Date will slide to the next valid working date when landing on a non-working or holiday date (9/5)

  • Task/Audits – Adding Views and Report Templates to assist with Reporting on Task/Audit results (9/5)

Safety

  • OSHA 300 – Changed the Employee Name field to use the First Name and Last Name fields on the incident form as the primary fields to give safety administrators more control over the final output (9/5)

General

  • New Dutch language added to user preferences (9/12)

  • User Menu – Added new menu options with links to the Thrive Webinar Videos and to the subscribe page for Webinar and News emails (9/12)

Thrive Lean Technologies is dedicated to providing educational content, offering shop floor automation software that allows for optimized systems.

Thrive Lean Technologies

Thrive Lean Technologies is dedicated to providing educational content, offering shop floor automation software that allows for optimized systems.

Back to Blog